Background and Objectives
Growing data processing volumes and increasing loads on server equipment raised the demands on the engineering infrastructure of the telecommunications company. One of the key priorities was to upgrade cooling systems to maintain the stable temperature in server rooms.
The project covered more than 10 facilities in different regions of Ukraine, from Lviv to Odesa and from Uzhhorod to Khmelnytskyi. This geographic scope required a coordinated approach to design, equipment supply, and installation works.
At the same time, the modernization should take place without interrupting server operations. Any downtime, delays, or risks to data integrity were unacceptable. Therefore, the Compass Engineering team developed a step-by-step implementation plan that took into account the specific features of each server room and the need to ensure the uninterrupted operation of critical infrastructure.
Project Objectives
- To increase the cooling capacity of server rooms
- To implement contemporary automated temperature control systems
- To ensure centralized monitoring of environmental parameters
- To reduce cooling operating costs
- To create additional capacity reserves for the further development of the technology infrastructure
Solution Implementation
Compass Engineering carried out a comprehensive range of works to modernize the engineering infrastructure at the customer’s facilities.
Cooling System Upgrade
Modern Schneider Electric chillers and air-conditioning systems were implemented to increase the cooling capacity. The equipment was selected based on the requirements of the server rooms and the potential future increase in load.
Temperature Control Automation
The upgraded infrastructure was equipped with automated environmental parameter control. This enables optimization of cooling system operation, temperature control, and improved energy efficiency.
Monitoring Integration
The cooling systems were integrated with the existing monitoring tools, ensuring remote monitoring of their status and prompt access to information about operating parameters.
Implementation Stages
The project implementation consisted of six main stages:
- Development of engineering solutions for the facilities
- Work planning and schedule coordination with stakeholders
- Delivery of equipment to the server rooms
- Dismantling of outdated cooling systems
- Installation, commissioning, and testing of the new equipment
- Commissioning of the upgraded systems and staff training
Special attention was paid to coordinating activities across the server rooms and adhering to the agreed schedules, resulting in the modernization without affecting server equipment operations.
Results
20% savings on cooling
The upgrade of the air-conditioning systems and implementation of automated control reduced cooling costs by 20%.
Expanding technological capabilities
The upgraded engineering infrastructure provides reserves for further expansion of server capacity without the need to upgrade the cooling system again in the coming years.
Centralized real-time monitoring
Integration with the existing monitoring systems enabled remote monitoring of environmental parameters and equipment status.
Uninterrupted operation of server rooms
The modernization was carried out without shutting down the server equipment, ensuring the sustainable operation of the critical telecommunications infrastructure.
“Modernizing the engineering infrastructure across a distributed network of server rooms is a task where not only the technical specifications of the equipment matter but also the precision of planning and coordination at every stage. We successfully upgraded the cooling systems without interrupting server operations, while improving energy efficiency and laying the foundation for the further development of the customer’s IT capacity,” Oleksandra Berezhna, the Head of the Project Management Department at Compass Engineering, said.